April 19 (Reuters) - Woodside Energy Group Ltd (WDS) :
- QUARTERLY REVENUE OF $2,969 MILLION, DOWN 12% FROM Q4 2023
- FULL YEAR GUIDANCE REMAINS UNCHANGED
- QTRLY PRODUCTION 44.9 MMBOE VERSUS 46.8 MMBOE REPORTED LAST YEAR
- QTRLY SALES 45.9 MMBOE VERSUS 50.4 MMBOE
- SCARBOROUGH AND PLUTO TRAIN 2 PROJECT WAS 62% COMPLETE AT THE END OF THE QUARTER AND FIRST LNG CARGO IS TARGETED FOR 2026
- SANGOMAR PROJECT WAS 96% COMPLETE AT THE END OF THE QUARTER AND TARGETING FIRST OIL IN MID 2024
- SANGOMAR PROJECT FPSO 96% COMPLETE AT END OF QUARTER AND TARGETING FIRST OIL IN MID2024
- WOODSIDE IS TARGETING SUPPLY OF HYDROGEN TO WESTERN AUSTRALIAN INDUSTRIAL AND PUBLIC CUSTOMERS IN 2025 FOR REFUELLER@H2PERTH
- PYRENEES FPSO COMMENCED PLANNED 5-YEARLY MAINTENANCE TURNAROUND IN SINGAPORE DRYDOCK, IS EXPECTED TO RETURN TO PRODUCTION IN Q2 2024
- KIPPER COMPRESSION PROJECT WILL SUPPORT THE SUPPLY OF GAS TO THE EAST COAST DOMESTIC GAS MARKET FROM H2 2024
- TRANSOCEAN ENDURANCE DRILL RIG HAS MOBILISED TO STYBARROW FIELD AND COMMENCED THE TEN WELL PLUG AND ABANDONMENT CAMPAIGN
(([email protected];))
To read reuters' full disclaimer click here