Woodside Energy Posts Qtrly Revenue Of $2,969 Million, Down 12% From Q4 2023

April 19 (Reuters) - Woodside Energy Group Ltd (WDS) :

  • QUARTERLY REVENUE OF $2,969 MILLION, DOWN 12% FROM Q4 2023
  • FULL YEAR GUIDANCE REMAINS UNCHANGED
  • QTRLY PRODUCTION 44.9 MMBOE VERSUS 46.8 MMBOE REPORTED LAST YEAR
  • QTRLY SALES 45.9 MMBOE VERSUS 50.4 MMBOE
  • SCARBOROUGH AND PLUTO TRAIN 2 PROJECT WAS 62% COMPLETE AT THE END OF THE QUARTER AND FIRST LNG CARGO IS TARGETED FOR 2026
  • SANGOMAR PROJECT WAS 96% COMPLETE AT THE END OF THE QUARTER AND TARGETING FIRST OIL IN MID 2024
  • SANGOMAR PROJECT FPSO 96% COMPLETE AT END OF QUARTER AND TARGETING FIRST OIL IN MID2024
  • WOODSIDE IS TARGETING SUPPLY OF HYDROGEN TO WESTERN AUSTRALIAN INDUSTRIAL AND PUBLIC CUSTOMERS IN 2025 FOR REFUELLER@H2PERTH
  • PYRENEES FPSO COMMENCED PLANNED 5-YEARLY MAINTENANCE TURNAROUND IN SINGAPORE DRYDOCK, IS EXPECTED TO RETURN TO PRODUCTION IN Q2 2024
  • KIPPER COMPRESSION PROJECT WILL SUPPORT THE SUPPLY OF GAS TO THE EAST COAST DOMESTIC GAS MARKET FROM H2 2024
  • TRANSOCEAN ENDURANCE DRILL RIG HAS MOBILISED TO STYBARROW FIELD AND COMMENCED THE TEN WELL PLUG AND ABANDONMENT CAMPAIGN

(([email protected];))



To read reuters' full disclaimer click here
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.