MMI 2.38% 4.3¢ metro mining limited

2022 production progress, page-7

  1. 613 Posts.
    lightbulb Created with Sketch. 159
    Bulk Carrier Capacity (DWT)Entry DateExit DateLoading time
    Berge Broad Peak 177,876 11/04/202224/04/2022
    Berge Orizaba175,656 22/04/2002
    Total353,532
    Yellow and italics are planned movements. I will update to actual once the movement has occurred.

 
watchlist Created with Sketch. Add MMI (ASX) to my watchlist
(20min delay)
Last
4.3¢
Change
0.001(2.38%)
Mkt cap ! $250.1M
Open High Low Value Volume
4.2¢ 4.4¢ 4.2¢ $520.8K 12.28M

Buyers (Bids)

No. Vol. Price($)
1 348837 4.3¢
 

Sellers (Offers)

Price($) Vol. No.
4.4¢ 1875428 8
View Market Depth
Last trade - 15.55pm 27/05/2024 (20 minute delay) ?
Last
4.3¢
  Change
0.001 ( 4.88 %)
Open High Low Volume
4.2¢ 4.3¢ 4.2¢ 6720379
Last updated 15.52pm 27/05/2024 ?
MMI (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.