SSN 0.00% 1.5¢ samson oil & gas limited

Ann: Operational Advisory, page-2

  1. 6,692 Posts.
    lightbulb Created with Sketch. 155
    ROOSEVELT PROJECT
    Australia II 12KA 6, #1-29H, (SSN 100%)
    A work over rig was moved onto the well July 16th to re-establish production. Rods were parted at the top of the pump. Tubing was pulled to retrieve the pump. Tubing, rods, and a new pump were run back in hole, and the well was put on production July 18th. Since then, the well has flowed 317
    bbls oil at a rate of 159 BOPD.
 
watchlist Created with Sketch. Add SSN (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.