@kingofhell, BKT is in the same unfortunate position as KNL with a 1100KM drive from Epanko North/Cascade/Ulanzi to the Magnis processing centre.
KNL will probably need to revise their BFS and BKT include the additional costs of transportation over 1100KMs (2-3 days on African roads).
Hopefully their OPEX doesn't blow out too much from this.
All IMO and DYOR
- Forums
- ASX - By Stock
- Ann: Agreement with Tanzanian Government to progress Nachu
@kingofhell, BKT is in the same unfortunate position as KNL with...
- There are more pages in this discussion • 251 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MNS (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.2¢ |
Change
0.000(0.00%) |
Mkt cap ! $50.37M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MNS (ASX) Chart |
Day chart unavailable