ASN “intends to fund the development of this project, (Green River Processing Plant), from future cash flow generated by the Paradox Project.” Which reads to me like it will be quite sometime after Paradox is in production that the funds will be available to fund the processing plant at Green River. Assuming, if they want $US500m for Paradox they will need around $US300m for Green River. So unsure how both projects can work in parallel with one another.
TT might be able to give a ball park answer to the next question. Roughly how much Battery Grade Lithium Carbonate can be extracted from 2.0 - 2.6 billion tons of brine grading 110 - 150ppm, please?
- Forums
- ASX - By Stock
- Ann: Anson to Acquire Land for Green River Li Processing Plant
ASN “intends to fund the development of this project, (Green...
- There are more pages in this discussion • 40 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add ASN (ASX) to my watchlist
(20min delay)
|
|||||
Last
12.5¢ |
Change
0.015(13.6%) |
Mkt cap ! $161.0M |
Open | High | Low | Value | Volume |
11.5¢ | 12.5¢ | 11.3¢ | $234.9K | 1.963M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 286458 | 12.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.5¢ | 938553 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 228333 | 0.120 |
9 | 791024 | 0.115 |
16 | 473124 | 0.110 |
17 | 1770237 | 0.105 |
32 | 1394069 | 0.100 |
Price($) | Vol. | No. |
---|---|---|
0.125 | 908553 | 10 |
0.130 | 1061712 | 23 |
0.135 | 587385 | 9 |
0.140 | 344280 | 10 |
0.145 | 586260 | 10 |
Last trade - 16.10pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
12.5¢ |
  |
Change
0.015 ( 13.6 %) |
|||
Open | High | Low | Volume | ||
11.3¢ | 12.5¢ | 11.0¢ | 1221669 | ||
Last updated 15.53pm 03/05/2024 ? |
Featured News
ASN (ASX) Chart |