BGD 3.17% 30.5¢ barton gold holdings limited

Ann: Central Gawler Mill valued at over $100m replacement cost, page-2

  1. 3,622 Posts.
    lightbulb Created with Sketch. 1448
    So either way you slice it, the mill is greater than our current MC and we have 1.2 million oz of gold (and growing) and cash at bank.

    Price is only expensive in the absence of value but in this case the value far exceeds the current price.

    "This report has valued the Central Gawler Mill and associate infrastructure at over $100 million on an 'as new' (replacement cost) basis, or over $50 million on an 'as is' indemnity value basis."



    And another update from recent mining conference.
    Last edited by BaltasarG: 01/06/23
 
watchlist Created with Sketch. Add BGD (ASX) to my watchlist
(20min delay)
Last
30.5¢
Change
-0.010(3.17%)
Mkt cap ! $66.62M
Open High Low Value Volume
30.5¢ 31.5¢ 30.0¢ $132.9K 434.6K

Buyers (Bids)

No. Vol. Price($)
1 5000 30.0¢
 

Sellers (Offers)

Price($) Vol. No.
32.0¢ 69375 1
View Market Depth
Last trade - 16.10pm 23/05/2024 (20 minute delay) ?
Last
30.5¢
  Change
-0.010 ( 2.49 %)
Open High Low Volume
30.0¢ 31.5¢ 29.5¢ 122202
Last updated 15.47pm 23/05/2024 ?
BGD (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.