Also add large blowout in construction costs, plant partially built and need to find around an extra 60 million. Much rather be holding DNK with such an experienced team.
- Forums
- ASX - By Stock
- Ann: Colluli SOP Project Update
Also add large blowout in construction costs, plant partially...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add DNK (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $151.0M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
DNK (ASX) Chart |
Day chart unavailable