It's been 21 days since Maris 1-16H stimulation was completed. Completed on the 29th June with 14 days needed to determine the effectiveness of the stimulation.
Last reported production was 1322 bopd.....
Another borrowing base redetermination will be performed based on Samson’s June 30th, 2016 reserves after that reserves analysis has been completed by Samson’s independent reserve engineers.
- Forums
- ASX - By Stock
- SSN
- Ann: Completion of Initial Multi-Stage Acid Stimulation-SSN.AX
Ann: Completion of Initial Multi-Stage Acid Stimulation-SSN.AX, page-17
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)