MNS 0.00% 4.2¢ magnis energy technologies ltd

Slide 37 - "Time Frame on Next Steps". This slide lacks detail...

  1. 563 Posts.
    lightbulb Created with Sketch. 32
    Slide 37 - "Time Frame  on Next Steps".

    This slide lacks detail to the point of being ludicrous. Schedules require milestones to be stated specifically, i.e. at specific points in time. To present key milestones such as Funding/Finance, Feasibility Studies, Offtakes and Production as dates stretching "onwards" for years is pointless.

    Capture.PNG
 
watchlist Created with Sketch. Add MNS (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.