I like that there will be 2 tranches of drilling which means two sets of results. SP should build on anticipation of results, then take off on any good results, so much potential here if this turns into a major greenfield discovery....
...."This programme will be carried out in two tranches of 1,500m so that the Company can assess the assays mid programme."
- Forums
- ASX - By Stock
- Ann: Drilling to Commence at Yandal West Gold Project
I like that there will be 2 tranches of drilling which means two...
- There are more pages in this discussion • 31 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GTE (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.1¢ |
Change
-0.004(6.15%) |
Mkt cap ! $21.22M |
Open | High | Low | Value | Volume |
6.5¢ | 6.6¢ | 6.1¢ | $32.04K | 523.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 6960 | 6.1¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.4¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 6960 | 0.061 |
3 | 236700 | 0.060 |
1 | 137758 | 0.058 |
1 | 100000 | 0.057 |
1 | 85600 | 0.056 |
Price($) | Vol. | No. |
---|---|---|
0.064 | 100000 | 1 |
0.065 | 87666 | 1 |
0.066 | 203741 | 3 |
0.069 | 89991 | 1 |
0.070 | 208668 | 4 |
Last trade - 14.55pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
6.1¢ |
  |
Change
-0.004 ( 1.61 %) |
|||
Open | High | Low | Volume | ||
6.5¢ | 6.5¢ | 6.1¢ | 104807 | ||
Last updated 14.15pm 03/05/2024 ? |
Featured News
GTE (ASX) Chart |