Difficult to improve value in exploration without drilling holes. 6 drill rigs is one way. That's a lot of rigs. Probably the same amount the Delta and Azure are throwing the kitchen sink at as well. Its all about the Mt @ grade. Then you can start to do back of envelop calculations. Insto's will move until they see more tonnes so you want to think the planned holes are in the right place and grade comes in.
- Forums
- ASX - By Stock
- Ann: Drilling Underway at Manna Lithium Project
Difficult to improve value in exploration without drilling...
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GL1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
36.5¢ |
Change
-0.020(5.19%) |
Mkt cap ! $94.99M |
Open | High | Low | Value | Volume |
38.5¢ | 38.5¢ | 36.5¢ | $148.8K | 397.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 51442 | 36.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
37.5¢ | 67943 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 51442 | 0.365 |
5 | 76780 | 0.360 |
5 | 112569 | 0.355 |
8 | 114927 | 0.350 |
1 | 7700 | 0.340 |
Price($) | Vol. | No. |
---|---|---|
0.375 | 67943 | 3 |
0.385 | 23001 | 3 |
0.390 | 204299 | 3 |
0.395 | 42000 | 2 |
0.400 | 195728 | 5 |
Last trade - 16.10pm 06/05/2024 (20 minute delay) ? |
|
|||||
Last
37.5¢ |
  |
Change
-0.020 ( 3.28 %) |
|||
Open | High | Low | Volume | ||
38.5¢ | 38.5¢ | 36.5¢ | 36556 | ||
Last updated 15.58pm 06/05/2024 ? |
Featured News
GL1 (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online