EM2 0.00% 6.5¢ eagle mountain mining limited

Yep. EG Jubilee Metals: glycine leaching waste - aiming to...

  1. 691 Posts.
    lightbulb Created with Sketch. 237

    Yep.

    EG Jubilee Metals: glycine leaching waste - aiming to produce 20,000 tpa Cu @<$4,000/t for $50m capex, 12 months to construct and commission


    · Jubilee secures one of the largest copper waste rock assets on surface in Zambia.

    · Estimated at more than 350 million tonnes of waste rock material on surface. Early results from preliminary surface sampling indicate zones with grades higher than 1.5% copper ("Waste Rock Project").

    · Jubilee's technical services team has commenced extensive resource definition and process technical review with the aim of completing the project implementation detail and timeline within the next 60 days.

    · Processing by Jubilee's newly developed modular copper units aims to produce in excess of 20 000 tonnes per annum of copper at a cost of below US$4 000 per tonne of copper from this historical waste rock dump.

    · Overall project costs including mining equipment and project infrastructure are likely to be around US$50 million.

    · Jubilee has the capability to construct and commission all modular copper units within a 12-month period and aims to commence within Q1 CY2024.

 
watchlist Created with Sketch. Add EM2 (ASX) to my watchlist
(20min delay)
Last
6.5¢
Change
0.000(0.00%)
Mkt cap ! $25.53M
Open High Low Value Volume
6.4¢ 6.5¢ 6.1¢ $24.99K 399.3K

Buyers (Bids)

No. Vol. Price($)
1 75000 6.2¢
 

Sellers (Offers)

Price($) Vol. No.
6.5¢ 18062 1
View Market Depth
Last trade - 15.43pm 30/05/2024 (20 minute delay) ?
Last
6.3¢
  Change
0.000 ( 3.08 %)
Open High Low Volume
6.2¢ 6.3¢ 6.1¢ 211640
Last updated 15.32pm 30/05/2024 ?
EM2 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.