See ARU ann.
SULPHIDE MINERALISATION INTERSECTED IN EARLY DRILLING
HAMMER HILL JV, NORTHERN TERRITORY
Mithril Resources had advised Arafura Resources that the first drill hole in the Hammer Hill
Joint Venture drilling program has intersected sulphide mineralisation.
Drilling at Hammer Hill commenced in early-May 2008 (ARU: ASX 05/05/08) targeting
priority airborne electromagnetic (VTEM) features considered to represent conductive nickel
sulphide mineralisation. Mithril Resources and BHP Billiton can earn up to 70% interest in
the Hammer Hill JV by spending $5 million over a 6 year period (Arafura to retain 30%).
Drill hole HHDD001 was designed to test VTEM target IVT016 (Figure 1) in the south central
part of the Hammer Hill JV tenements. Visual inspection of drill core from HHDD001 by
Mithril geologists indicates a significant sulphide zone has been intersected from 341.75
metres to 348 metres down hole (6.25 metres wide). This zone contains copper-bearing
sulphide as well as other sulphide minerals. Thin veins of sulphide mineralisation are evident
in the drill hole at depths beyond 150 metres.
Assays from drill hole HHDD001 are not expected for at least another four weeks.
Drilling continues at the IVT016 target zone, and will be augmented by down hole
geophysical targeting methods. The second drill hole in the program (HHDD002) will test a
separate electromagnetic target 490 metres south of HHDD001.
I hold ARU.
choice
- Forums
- ASX - By Stock
- MTH
- hammer hill ni mineralisation
hammer hill ni mineralisation
Featured News
Add MTH (ASX) to my watchlist
(20min delay)
|
|||||
Last
20.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $67.4K |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
MTH (ASX) Chart |
Day chart unavailable