-
Share
29,310 Posts.
80
29/04/02
13:50
Share
re: CKG Drilling results! - up to 23.2g/t Au-Ann.
Central Kalgoorlie: high-grade intersects at Eureka
13:53, Monday, 29 April 2002
Sydney - Monday - April 29: (RWE) - Central Kalgoorlie Gold
Mines Ltd today announced the presence of high-grade gold mineralisation
associated with sulphides in sheared and altered volcanics about 170
metres below the surface (45m below the bottom of the existing open pit)
at its Eureka Project.
The Eureka Project is near Bardoc, 50km north of Kalgoorlie in
the Eastern Goldfields of WA.
Highlights of the drilling results to date were:
* Hole ERC 6 intersected 2m at 23.2g/t gold as part of an
intersection of 11m at 5.76g/t gold;
* Hole ERC 11 intersected 3m at 7.07g/t gold as part of an
intersection of 5m at 4.49g/t gold.
Central Kalgoorlie rose 0.2c to 3c.
Copyright © 2002 RWE Australian Business News. All rights reserved.