they can build much smaller pure gas turbine plants without the boiler (the heat exchanger / big thing in the picture).
This is a much smaller solution and arguable modular and much easier to stand up than a combined plant (and probably make most sense when looking at a smaller solution).
Combined plants, which is what Brent has posted is a gas turbine with a boiler too, to recover the heat then this is cycled through a steam turbine.
Smaller option is only 30-40% efficient in power generation. Conbined plants are 50-60% I believe so obviously the greenest option.
100% Combined cycle plant makes sense for bigger plants. But I think you can go smaller with just gas turbines to get up and running. Then move to Combined cycle (gas turbine + recovery heat exchanger + steam turbine) for larger plants to maximize the efficiency.
gas turbines alone will be a much cheaper option.
Correct me if I'm wrong Brentb?
- Forums
- ASX - By Stock
- IVZ
- Ann: Gas Sales Agreement to Deliver Power to Eureka Gold Mine
Ann: Gas Sales Agreement to Deliver Power to Eureka Gold Mine, page-211
-
- There are more pages in this discussion • 81 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.5¢ |
Change
-0.001(1.52%) |
Mkt cap ! $92.16M |
Open | High | Low | Value | Volume |
6.7¢ | 6.7¢ | 6.4¢ | $127.4K | 1.974M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 328948 | 6.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.5¢ | 57625 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 328948 | 0.064 |
3 | 37867 | 0.063 |
8 | 112049 | 0.062 |
2 | 491963 | 0.061 |
7 | 575600 | 0.060 |
Price($) | Vol. | No. |
---|---|---|
0.065 | 52246 | 2 |
0.066 | 100448 | 5 |
0.067 | 169230 | 2 |
0.068 | 282056 | 3 |
0.069 | 110901 | 2 |
Last trade - 14.11pm 30/05/2024 (20 minute delay) ? |
|
|||||
Last
6.5¢ |
  |
Change
-0.001 ( 2.99 %) |
|||
Open | High | Low | Volume | ||
6.6¢ | 6.6¢ | 6.4¢ | 1185820 | ||
Last updated 14.28pm 30/05/2024 ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
AHK
ARK MINES LIMITED
Ben Emery, Executive Director
Ben Emery
Executive Director
Previous Video
Next Video
SPONSORED BY The Market Online