It's something at least...standard timeframe blow out.
Also annoyed that no mention of roadmap to relisting...it would be nice to know if the building blocks were in place for a relisting so it could be done asap after PFS completion.
- Forums
- ASX - By Stock
- Ann: HyEnergy Project Update
It's something at least...standard timeframe blow out.Also...
-
- There are more pages in this discussion • 15 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PRL (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $48.44M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PRL (ASX) Chart |
Day chart unavailable