People will be surprised how low the capex will be. Alot of the ground work is completed during the past 3 years.
Tailings dam and plant is all they need.
Access portals are done.
18km of tunnels in place and mine ready. Ventilation done
Power done
Safety inspection done
Camp site done
Some permits done.
Anyway at 7cents we're cheap and I'll add thru the rights issue.
Cheers
- Forums
- ASX - By Stock
- Ann: Mid-Tier Copper Production Focus for Scoping Study
People will be surprised how low the capex will be. Alot of the...
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EM2 (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.2¢ |
Change
0.002(3.33%) |
Mkt cap ! $23.57M |
Open | High | Low | Value | Volume |
6.2¢ | 6.3¢ | 6.2¢ | $10.45K | 167.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 450000 | 6.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.2¢ | 50155 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 500000 | 0.060 |
1 | 66766 | 0.059 |
3 | 542459 | 0.058 |
3 | 131000 | 0.057 |
2 | 329995 | 0.056 |
Price($) | Vol. | No. |
---|---|---|
0.062 | 50000 | 1 |
0.063 | 141666 | 2 |
0.064 | 265661 | 1 |
0.065 | 75000 | 1 |
0.066 | 13500 | 1 |
Last trade - 10.30am 29/04/2024 (20 minute delay) ? |
|
|||||
Last
6.2¢ |
  |
Change
0.002 ( 5.08 %) |
|||
Open | High | Low | Volume | ||
6.2¢ | 6.2¢ | 6.2¢ | 48128 | ||
Last updated 10.30am 29/04/2024 ? |
Featured News
EM2 (ASX) Chart |