EM2 0.00% 6.5¢ eagle mountain mining limited

Ann: Mid-Tier Copper Production Focus for Scoping Study, page-13

  1. 2,989 Posts.
    lightbulb Created with Sketch. 249
    People will be surprised how low the capex will be. Alot of the ground work is completed during the past 3 years.

    Tailings dam and plant is all they need.
    Access portals are done.
    18km of tunnels in place and mine ready. Ventilation done
    Power done
    Safety inspection done
    Camp site done
    Some permits done.

    Anyway at 7cents we're cheap and I'll add thru the rights issue.

    Cheers
 
watchlist Created with Sketch. Add EM2 (ASX) to my watchlist
(20min delay)
Last
6.5¢
Change
0.000(0.00%)
Mkt cap ! $25.53M
Open High Low Value Volume
6.4¢ 6.5¢ 6.1¢ $24.99K 399.3K

Buyers (Bids)

No. Vol. Price($)
1 75000 6.2¢
 

Sellers (Offers)

Price($) Vol. No.
6.5¢ 18062 1
View Market Depth
Last trade - 15.43pm 30/05/2024 (20 minute delay) ?
Last
6.3¢
  Change
0.000 ( 3.08 %)
Open High Low Volume
6.2¢ 6.3¢ 6.1¢ 211640
Last updated 15.32pm 30/05/2024 ?
EM2 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.