People will be surprised how low the capex will be. Alot of the ground work is completed during the past 3 years.
Tailings dam and plant is all they need.
Access portals are done.
18km of tunnels in place and mine ready. Ventilation done
Power done
Safety inspection done
Camp site done
Some permits done.
Anyway at 7cents we're cheap and I'll add thru the rights issue.
Cheers
- Forums
- ASX - By Stock
- EM2
- Ann: Mid-Tier Copper Production Focus for Scoping Study
Ann: Mid-Tier Copper Production Focus for Scoping Study, page-13
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EM2 (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $25.53M |
Open | High | Low | Value | Volume |
6.4¢ | 6.5¢ | 6.1¢ | $24.99K | 399.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 75000 | 6.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.5¢ | 18062 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 75000 | 0.062 |
5 | 269903 | 0.061 |
2 | 134000 | 0.060 |
3 | 91949 | 0.059 |
1 | 75000 | 0.058 |
Price($) | Vol. | No. |
---|---|---|
0.065 | 18062 | 1 |
0.068 | 225000 | 2 |
0.070 | 78888 | 2 |
0.071 | 190000 | 2 |
0.073 | 110999 | 1 |
Last trade - 15.43pm 30/05/2024 (20 minute delay) ? |
|
|||||
Last
6.3¢ |
  |
Change
0.000 ( 3.08 %) |
|||
Open | High | Low | Volume | ||
6.2¢ | 6.3¢ | 6.1¢ | 211640 | ||
Last updated 15.32pm 30/05/2024 ? |
Featured News
EM2 (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online