Well VSR started drilling on 24.04.23
Then 3 weeks later only 15 drill holes, they only showed 4 chip trays, diagrams from 4 holes drilled at depths of at the most 45m-80m, so basically really easy to report photos and diagrams, RR1 are still drilling Phase 1 and still have another 5 days of drilling to go.
RR1 have drilled more holes (34) at deeper depths which take much longer than VSR phase 1 Drilling of only 15 holes at depths of 45m-80m
By the way RR1 has drilled 34 holes in that amount of time so more work and more samples to log and deal with, Im sure RR1 after Phase 1 drilling is over will update the market sometime in mid September.
- Forums
- ASX - By Stock
- Ann: Multiple Thick, Stacked Pegmatites Intersected at Morrissey
Well VSR started drilling on 24.04.23Then 3 weeks later only 15...
- There are more pages in this discussion • 140 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RR1 (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $11.36M |
Open | High | Low | Value | Volume |
1.3¢ | 1.3¢ | 1.3¢ | $20.01K | 1.539M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 687833 | 1.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 743468 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 764832 | 0.013 |
11 | 2801666 | 0.012 |
4 | 498750 | 0.011 |
6 | 749995 | 0.010 |
6 | 1113330 | 0.009 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 743468 | 4 |
0.015 | 761904 | 2 |
0.016 | 459333 | 4 |
0.017 | 428235 | 5 |
0.018 | 242217 | 3 |
Last trade - 15.27pm 04/06/2024 (20 minute delay) ? |
|
|||||
Last
1.3¢ |
  |
Change
0.000 ( 0.00 %) |
|||
Open | High | Low | Volume | ||
1.3¢ | 1.4¢ | 1.3¢ | 426871 | ||
Last updated 15.05pm 04/06/2024 ? |
Featured News
RR1 (ASX) Chart |