BCM 0.00% 2.5¢ brazilian critical minerals limited

Ann: New Discovery at Apui ENE REE Project with exceptional REE, page-26

  1. 427 Posts.
    lightbulb Created with Sketch. 90
    As someone who holds all three of the REE stocks listed below,
    BBX has neither the depth nor the grade quality to be a viable REE project, in my own opinion of course.
    I know which 2 of the 3 have made me fantastic returns and one is at a loss.

    DYOR, YMMV


    BBX
    Highlights
    • Exceptional results for TREO with values up to 2,757 ppm TREO in APTR-013, including 594 ppm
    Nd Pr oxides.
    Significant results:
    • 12 metres @ 1,380 ppm TREO from surface, including 5m @ 1,942 ppm TREO from 7 metres(APTR
    013)
    • 3 metres @ 1,130 ppm TREO from surface (APTR 014)
    • 4 metres @ 908 ppm TREO from surface (APTR 018)


    MEI
    Highlights
    ▪ Assay results from 27 diamond cores at the Caldeira Project received
    ▪ 85% of historic drilling was completed to an average depth of less than 10 metres. Meteoric’s new diamond
    drilling conclusively shows the clay zone and the High-Grade REE mineralisation extends significantly deeper,
    including to 36 metres at Capão do Mel and 56 metres at Figueira
    ▪ Assay highlights effectively commencing from surface include remarkable results of:
    – CDMDD001 - 31.2m @ 3,769 ppm TREO1
    including 16.4m @ 5,537 ppm TREO
    – CDMDD002 - 18.5m @ 3,808 ppm TREO, including 10.4m @ 5,000 ppm TREO
    – CDMDD004 - 16.4m @ 5,967 ppm TREO, including 10.7m @ 7,243 ppm TREO
    – CDMDD005 - 5.4m @ 8,200 ppm TREO
    – CDMDD006 - 36.0m @ 2,881 ppm TREO, including 9.0m @ 4,228 ppm TREO
    – CDMDD007 - 33.0m @ 2,102 ppm TREO
    – CVNDD001 - 19.2m @ 5,825 ppm TREO
    – CVNDD002 - 20.6m @ 4,111 ppm TREO, including 11.2m @ 5,538 ppm TREO
    – CVNDD003 - 31.8m @ 3,243 ppm TREO, including 4.0m @ 16,074 ppm TREO
    – CVNDD004 - 27.4m @ 2,914 ppm TREO, including 11.0m @ 5,066 ppm TREO
    – DM1DD002 - 33.6m @ 2,715 ppm TREO
    – DM1DD003 - 9.9m @ 4,741 ppm TREO
    – FGDD001 - 41.2m @ 1,846 ppm TREO, including 3.6m @ 3,711 ppm TREO
    – FGDD002 - 58.3m @ 2,449 ppm TREO, including 5.5m @ 4,834 ppm TREO
    – FGDD003 - 45.6m @ 3,352 ppm TREO, including 11.7m @ 6,108 ppm TREO
    – SBDD002 - 26.1m @ 3,348 ppm TREO, including 14.0m @ 4,365 ppm TREO

    VMM
     Assays from first two diamond holes at Fazenda returned outstanding REE-rich clay intercepts, all
    reported from surface:
    • FZ-DDH-001: 40.0m @ 2,162ppm TREO incl. 17.0m @3,042ppm TREO [34% MREO] from 7m.
    • FZ-DDH-002: 21.0m @ 2,132ppm TREO incl. 10.0m @2,760ppm TREO [32% MREO] from 11m.
     The first set of assay highlights from auger drilling confirms widespread and high-grade IAC REE
    mineralisation across numerous concessions in the Colossus Project:
    • FZ-AG-044: 8.0m @ 5,441ppm TREO (ending in mineralisation) from 6m, ending in 8,291ppm TREO.
    • FZ-AG-096: 15.0m @ 2,521ppm TREO (ending in mineralisation) from 0m, ending in 2,196ppm TREO.
    • FZ-AG-031: 3.0m @ 3,910ppm TREO (ending in mineralisation) from 3m, ending in 5,968ppm TREO.
    • FZ-AG-103: 10.9m @ 2,207ppm TREO (ending in mineralisation) from 0m, ending in 3,261ppm TREO.
    • CS-AG-036: 4.5m @ 6,067ppm TREO (ending in mineralisation) from 5m, ending in 6,034ppm TREO.
    • CS-AG-022: 20.0m @ 2,119ppm TREO (ending in mineralisation) from 0m, ending in 2,071ppm TREO.
    • CS-AG-037: 8.0m @ 3,535ppm TREO (ending in mineralisation) from 2m, ending in 2,535ppm TREO.
    • CS-AG-029: 8.0m @ 3,584ppm TREO (ending in mineralisation) from 3m, ending in 3,552ppm TREO.
    • CT-AG-002: 7.5m @ 2,924ppm TREO (ending in mineralisation) from 3m, ending in 2,353ppm TREO.
    • CJ-AG-025: 10.0m @ 2,441ppm TREO (ending in mineralisation) from 0m, ending in 2,785ppm TREO.
 
watchlist Created with Sketch. Add BCM (ASX) to my watchlist
(20min delay)
Last
2.5¢
Change
0.000(0.00%)
Mkt cap ! $18.64M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 99 2.5¢
 

Sellers (Offers)

Price($) Vol. No.
2.6¢ 421842 2
View Market Depth
Last trade - 16.12pm 16/05/2024 (20 minute delay) ?
BCM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.