    SAMSON OIL & GAS OPERATIONAL ADVISORY
    Denver 1700 hours January 28th, 2014, Perth 0700 hours January 29th, 2014
    NORTH STOCKYARD PROJECT, WILLIAMS COUNTY, NORTH DAKOTA
    Tooheys 4-15-14HBK (SSN WI 27.7%)
    Flow-back operations on this well are underway and in the first 38 hours of this operation 1,589 BO and 3,778 BW were recovered, representing an oil rate of 1,000 BOPD. The well is being flowed on a 28/64th choke and is therefore not flowing at its maximum potential. It is currently anticipated that the oil rate will increase over the next week as the water production decreases and the well cleans up. While the flow back period measured is relatively short, it is nevertheless above the Company’s pre-drill expectations.
    Little Creature 3-15-14HBK (SSN WI 27.7%),
    Flowback of Little Creature well was initiated but was curtailed because of a sand plug. A coil tubing unit has been rigged up today to drill out the frac plugs.
    Coopers 2-15-14HBK (SSN WI 27.7%)
    Flowback of Coopers well will follow the flow-back of Little Creature 3-15-14HBK well. Coopers, Tooheys and Little Creature are located on the Tofte 2 pad on the northern boundary of Section 14.
    Blackdog 3-13-14H (SSN WI 25.03%)
    The frac of the Blackdog is expected to commence February 5th. A coil tubing unit will be used subsequently to drill out the frac plugs in both the Blackdog and Sail and Anchor 1-13-14HBK wells (SSN WI 25.03%), enabling both of these wells to be put into production. These wells are located on the Tofte 1 pad, which is on the southern boundary of Section 13 within the North Stockyard project.
    Sail and Anchor 1-13-14HBK well (SSN WI 25.03%)
    Sail and Anchor was fracked in September 2013 and has been flowed back previously, though that prior flow back is believed to have been restricted by the frac plugs. A coil tubing unit will drill out the frac plugs when fracture stimulation is completed on the Blackdog well.
    Rennerfeldt 2-13-H (SSN WI 25.03%)
    The Rennerfeldt 2-13-HBK well was spudded on January 10th and drilled to 2,450 feet, where the surface casing string was set and cemented. The Frontier 24 rig has skidded back to this well and is currently drilling ahead the 8.75 inch hole at a depth of 3,458 feet. This hole will be drilled to a depth of around 11,500 feet (MD), where the 7 inch casing will set and cemented.
    Rennerfeldt 1-13-H (SSN WI 25.03%)
    Surface casing was set and cemented at 2,470 feet and a 8.75 inch vertical hole was drilled at a depth of 9,013 feet. The well was drilled at 11,571 feet (MD) and the 7” casing has been set and cemented in the middle Bakken. The forward operation will be to drill the 4,300 foot lateral in the Middle Bakken. However, prior to that operation being undertaken, the Frontier Rig 24 has been skidded back to Rennerfeldt 2-13H and is currently drilling that well’s 8.75 inch hole.
 