BC8 0.00% 34.5¢ black cat syndicate limited

Ok let's not talk mining costs because there is a full...

  1. 807 Posts.
    lightbulb Created with Sketch. 184
    Ok let's not talk mining costs because there is a full feasibility study in place but where that study is dramatically wrong is in the profit margins , gold just hit $3700 which means if production targets are met then at $3700 this project will generate an extra $28 million a year and a safety buffer is now in place , if production was AROUND 20% short of projections the anticipated profits would still be met , this is a very nice position to be in . The Gold price in 6 months time is any ones guess , my guess is a continued firming , lets see what happens .
 
watchlist Created with Sketch. Add BC8 (ASX) to my watchlist
(20min delay)
Last
34.5¢
Change
0.000(0.00%)
Mkt cap ! $106.4M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 2000 36.0¢
 

Sellers (Offers)

Price($) Vol. No.
30.0¢ 18200 1
View Market Depth
Last trade - 16.12pm 31/05/2024 (20 minute delay) ?
BC8 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.