Hi all
Looking promising, just need more certainty around timing.
- When are the team going to process the tailings dam? (At a minimum).
- The ‘Gravatron-5000’, when is that going to be installed?
and what will be the cost ($$ - equity, cash or debt?).
I like what I see, and the methodical nature of the gang, but jeez they move slowly.
Exciting 12 months ahead in my humble opinion… MC $80m before Xmas?
regards,
Pratta-tron-5000
- Forums
- ASX - By Stock
- Ann: Positive Processing Results from Hillgrove Gold Project
Hi allLooking promising, just need more certainty around...
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LRV (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.9¢ |
Change
0.001(1.02%) |
Mkt cap ! $25.02M |
Open | High | Low | Value | Volume |
10.0¢ | 10.5¢ | 9.6¢ | $161.8K | 1.611M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 5109 | 9.9¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.0¢ | 69606 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 5109 | 0.099 |
1 | 199800 | 0.098 |
1 | 90977 | 0.097 |
3 | 57974 | 0.096 |
4 | 94234 | 0.095 |
Price($) | Vol. | No. |
---|---|---|
0.100 | 69606 | 3 |
0.105 | 370808 | 9 |
0.110 | 1419505 | 6 |
0.115 | 202404 | 5 |
0.120 | 158351 | 3 |
Last trade - 11.14am 17/05/2024 (20 minute delay) ? |
|
|||||
Last
9.8¢ |
  |
Change
0.001 ( 1.03 %) |
|||
Open | High | Low | Volume | ||
10.0¢ | 10.5¢ | 9.6¢ | 1210620 | ||
Last updated 11.14am 17/05/2024 ? |
Featured News
LRV (ASX) Chart |