at the time of the particular study yes.
it's an analysis of the entire project as an investment case.
since the study, the plant has been built etc.
so if there was a feasibility study done now asking "shall the project continue", then sunk costs would not be included in the calculation of npv.
an investor should know the definitions:
dfs, bfs, npv, sunk costs, rrr, discount rate etc.
- Forums
- ASX - By Stock
- Ann: Production commencement at Alara JV Copper-Gold Mine in Oman
at the time of the particular study yes.it's an analysis of...
-
- There are more pages in this discussion • 242 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AUQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.7¢ |
Change
-0.003(4.29%) |
Mkt cap ! $48.11M |
Open | High | Low | Value | Volume |
6.9¢ | 6.9¢ | 6.7¢ | $13.86K | 205.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 281553 | 6.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.3¢ | 14000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
5 | 281553 | 0.065 |
3 | 294045 | 0.064 |
2 | 24377 | 0.062 |
1 | 100000 | 0.061 |
3 | 140000 | 0.060 |
Price($) | Vol. | No. |
---|---|---|
0.073 | 14000 | 1 |
0.078 | 27188 | 2 |
0.079 | 250000 | 2 |
0.080 | 301399 | 3 |
0.081 | 300000 | 2 |
Last trade - 15.54pm 17/05/2024 (20 minute delay) ? |
|
|||||
Last
6.7¢ |
  |
Change
-0.003 ( 6.94 %) |
|||
Open | High | Low | Volume | ||
6.8¢ | 6.8¢ | 6.7¢ | 51412 | ||
Last updated 15.09pm 17/05/2024 ? |
Featured News
AUQ (ASX) Chart |