at the time of the particular study yes.
it's an analysis of the entire project as an investment case.
since the study, the plant has been built etc.
so if there was a feasibility study done now asking "shall the project continue", then sunk costs would not be included in the calculation of npv.
an investor should know the definitions:
dfs, bfs, npv, sunk costs, rrr, discount rate etc.
- Forums
- ASX - By Stock
- Ann: Production commencement at Alara JV Copper-Gold Mine in Oman
at the time of the particular study yes.it's an analysis of...
-
- There are more pages in this discussion • 263 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AUQ (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.5¢ |
Change
0.009(13.6%) |
Mkt cap ! $53.85M |
Open | High | Low | Value | Volume |
6.5¢ | 7.5¢ | 6.5¢ | $76.82K | 1.083M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 38967 | 7.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.5¢ | 45220 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 38967 | 0.072 |
2 | 307100 | 0.071 |
1 | 100000 | 0.064 |
1 | 120000 | 0.063 |
4 | 153409 | 0.062 |
Price($) | Vol. | No. |
---|---|---|
0.075 | 220 | 1 |
0.079 | 250000 | 2 |
0.080 | 299999 | 2 |
0.081 | 325530 | 3 |
0.082 | 220000 | 3 |
Last trade - 16.10pm 21/05/2024 (20 minute delay) ? |
|
|||||
Last
7.4¢ |
  |
Change
0.009 ( 15.6 %) |
|||
Open | High | Low | Volume | ||
6.8¢ | 7.4¢ | 6.8¢ | 123708 | ||
Last updated 12.46pm 21/05/2024 ? |
Featured News
AUQ (ASX) Chart |
The Watchlist
AUQ
ALARA RESOURCES LIMITED
Stephen Gethin, Non-Executive Director & Chairman
Stephen Gethin
Non-Executive Director & Chairman
Previous Video
Next Video
SPONSORED BY The Market Online