AUQ 1.52% 6.7¢ alara resources limited

Ann: Production commencement at Alara JV Copper-Gold Mine in Oman, page-412

  1. 3,714 Posts.
    lightbulb Created with Sketch. 457
    cost anlaysis of mine:

    1mtpa processing rate
    $31.20 /t cost USD
    31,200,000
    producing 35ktpa concentrate
    over 77 million pounds
    at about 25% copper
    for about 19.3m pounds contained copper

    31.2m / 19.3m

    is $1.61 USD /lb

    is this approximate C1 cost? maybe



    also, looking at EBITDA
    at the different cases 7,000 7,500 8,000 etc.
    looks like break even EBITDA could be about
    4,500 usd/t
    about 2 USD /lb

    current price 4.30 /lb
 
watchlist Created with Sketch. Add AUQ (ASX) to my watchlist
(20min delay)
Last
6.7¢
Change
0.001(1.52%)
Mkt cap ! $48.11M
Open High Low Value Volume
6.9¢ 6.9¢ 6.7¢ $3.008K 44.89K

Buyers (Bids)

No. Vol. Price($)
1 200000 6.6¢
 

Sellers (Offers)

Price($) Vol. No.
6.8¢ 44776 1
View Market Depth
Last trade - 14.50pm 10/06/2024 (20 minute delay) ?
Last
6.7¢
  Change
0.001 ( 3.08 %)
Open High Low Volume
6.7¢ 6.7¢ 6.7¢ 35934
Last updated 11.16am 10/06/2024 ?
AUQ (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.