Red River’s Eleanora drill program at Hillgrove Gold Project progressing well – gold assays received from drill holes ELG136, ELG137 & ELG138 with broad intervals of mineralisation intersected:
- ELG136 intersected 16.6m @ 2.1 g/t Au from 41.4m down hole including 4.0m @ 4.0 g/t Au from 51.0m downhole
- ELG138 intersected 8.6m @ 3.2 g/t Au from 62.4m down hole including 3.7m @ 4.6 g/t Au from 63.7m downhole
• Drill holes ELG139, ELG140 and ELG141 completed and dispatched for assay