STX 4.76% 20.0¢ strike energy limited

i found the wording of having to wait on additional equipment...

  1. 93 Posts.
    lightbulb Created with Sketch. 22
    i found the wording of having to wait on additional equipment strange given logging trucks were already in the general area. hence the suggestion of coil tubing as reasoning for delay as less readily available and much cheaper than some of the alternatives. as for the loggers - given the what and if discussion on surveying techniques, if i had an (electrified) data transmittal unit onsite i would utilize the equipment to its maximum potential and run additional logs to address potential issues of lateral borehole instability as best practice reservoir management. if i have already paid for the electrified logging truck and crew to setup and shoot a few more holes - why not some additional real time data logs also ?
 
watchlist Created with Sketch. Add STX (ASX) to my watchlist
(20min delay)
Last
20.0¢
Change
-0.010(4.76%)
Mkt cap ! $572.1M
Open High Low Value Volume
21.0¢ 21.3¢ 20.0¢ $1.933M 9.486M

Buyers (Bids)

No. Vol. Price($)
30 1719264 20.0¢
 

Sellers (Offers)

Price($) Vol. No.
20.5¢ 895737 14
View Market Depth
Last trade - 16.10pm 30/05/2024 (20 minute delay) ?
Last
20.0¢
  Change
-0.010 ( 5.17 %)
Open High Low Volume
21.0¢ 21.3¢ 20.0¢ 2028008
Last updated 15.59pm 30/05/2024 ?
STX (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.