jeez. the termites have come out of the woodwork certainly. a lot of fear mongering going on.
goulamina is still a go.
project construction is still progressing.
all the economical studies (PFS, FID etc.) have been done
why would they even stop construction at this stage it just sounds silly to me. they'll get sued from corica.
gotta look at it from an operational perspective and not announcements (or lack thereof). leo is just following the asx rules.
wait a few years and we will be a $3B+ capped company. as long as simon is still head honcho i'll stay put.
- Forums
- ASX - By Stock
- Ann: Suspension from Quotation - Listing Rule 17.3
jeez. the termites have come out of the woodwork certainly. a...
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add LLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
50.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $498.5M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
LLL (ASX) Chart |
Day chart unavailable