QPM 0.00% 3.4¢ queensland pacific metals limited

Numerous industry reports indicated that capex for new build...

  1. 1,913 Posts.
    lightbulb Created with Sketch. 608
    Numerous industry reports indicated that capex for new build projects in Australia had increased by around 40% in the space of 12-18 months. As this trend reverses and costs normalise, there is significant scope for capex to be materially lower. The figures presented in this feasibility study represent the worst possible scenario from a costs perspective. All IMO and GLTAH.
 
watchlist Created with Sketch. Add QPM (ASX) to my watchlist
(20min delay)
Last
3.4¢
Change
0.000(0.00%)
Mkt cap ! $85.70M
Open High Low Value Volume
3.4¢ 3.4¢ 3.3¢ $50.09K 1.492M

Buyers (Bids)

No. Vol. Price($)
12 1325095 3.3¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 730206 7
View Market Depth
Last trade - 16.10pm 06/06/2024 (20 minute delay) ?
Last
3.4¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
3.4¢ 3.4¢ 3.3¢ 2199798
Last updated 15.51pm 06/06/2024 ?
QPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.