MAY 3.51% 5.5¢ melbana energy limited

AP We Need a 2nd Drill Rig for Block 9 ASAP, page-3

  1. 19 Posts.
    lightbulb Created with Sketch. 11
    I like your enthusiasm but but i am confident you cant design and build an operational plant inclusive of well head, separators, tanks, flare, pipe runs, power generation etc, not to mention approvals from government, this would take a few years at best. Perhaps they could have a temporary pilot/testing plant or something in a 6+ month time frame if there are options like that? Remember it takes 9 -12 months to build a house with 4 walls and a roof. IMO if MAY can get a good result from Zapato and relocate the rig to Alameda ready with long lead items to drill and flow test I will be very happy with the progress for this year.
 
watchlist Created with Sketch. Add MAY (ASX) to my watchlist
(20min delay)
Last
5.5¢
Change
-0.002(3.51%)
Mkt cap ! $185.3M
Open High Low Value Volume
5.6¢ 5.7¢ 5.5¢ $105.3K 1.895M

Buyers (Bids)

No. Vol. Price($)
9 884087 5.5¢
 

Sellers (Offers)

Price($) Vol. No.
5.6¢ 12991 1
View Market Depth
Last trade - 16.10pm 01/05/2024 (20 minute delay) ?
Last
5.5¢
  Change
-0.002 ( 3.00 %)
Open High Low Volume
5.6¢ 5.7¢ 5.5¢ 1190383
Last updated 15.59pm 01/05/2024 ?
MAY (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.