Steelworks Development[edit] Blast Furnace No.1 was built...

  1. 1,452 Posts.
    Steelworks Development[edit]

    • Blast Furnace No.1 was built between 1938 and 1941, blown in 1941, relined in 1965, closed in 1981 and demolished 1997.
    • Blast Furnace No.2 was built in 1965, relined 1981 and again in 2004.
    • The Boilerhouse was built in 1941 with 3 boilers. Boiler No.4 was added in 1950 and Nos. 5 and 6 in the late 1960s. Only Nos. 5 and 6 remain in full-time operation, with No.4 on standby.
    • The Salt Water Pump House was built in 1941 with 3 salt water pumps with another 3 pumps added later. Only 5 remain, with No.1 now serving as a backup diesel pump.
    • The Coke Ovens were built in the 1960s with 2 batteries. Another battery was added in the 1980s.
    • A 1.5 GL reverse osmosis seawater desalination plant was commissioned in December 2011.
    1700 people to make 1M tons of steel
    the plant is a museum piece

    Global steel production 1200 M tons
    Steel production between 600 and 1200 (china) tons per worker
    Australia 1M tons/1700 workers = 588 tons per worker
 