Looking at the size of our resource AVL would need expansion projects for another plant (or two) during that 25yrs. Economic factors willing.
@sabine shutdown schedule will be unique to the site and its plant. It mostly depends on the complexity of the process flow designed by Wood and how the stages are integrated (or separated).
I am banking on Wood having this well in hand based on their experience. Good design = less maintenance and more uptime.
- Forums
- ASX - By Stock
- AVL news
Looking at the size of our resource AVL would need expansion...
- There are more pages in this discussion • 141 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AVL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.6¢ |
Change
0.001(6.67%) |
Mkt cap ! $137.7M |
Open | High | Low | Value | Volume |
1.6¢ | 1.7¢ | 1.6¢ | $48.73K | 3.012M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
7 | 2526005 | 1.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.7¢ | 4411389 | 11 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 2526005 | 0.016 |
67 | 16354459 | 0.015 |
28 | 9042145 | 0.014 |
52 | 16109722 | 0.013 |
22 | 4807672 | 0.012 |
Price($) | Vol. | No. |
---|---|---|
0.017 | 4411389 | 11 |
0.018 | 11738481 | 31 |
0.019 | 5557835 | 10 |
0.020 | 9563326 | 19 |
0.021 | 9100000 | 2 |
Last trade - 16.10pm 23/05/2024 (20 minute delay) ? |
|
|||||
Last
1.6¢ |
  |
Change
0.001 ( 3.23 %) |
|||
Open | High | Low | Volume | ||
1.6¢ | 1.7¢ | 1.6¢ | 1809268 | ||
Last updated 15.27pm 23/05/2024 ? |
Featured News
AVL (ASX) Chart |