Not sure I agree with that. There is an element of fixed and variable costs in all production. In theory the fixed will not increase therefore only the variable costs increase resulting in a lower average cost of production. Our problem has been not hitting production targets, increasing average cost. If we meet the mid point annual target as advised in the last quarterly, which means a boomer production quarter, as we are well behind after 3 quarters, we will have a great result and asic should be lower.
- Forums
- ASX - By Stock
- Copper news
Not sure I agree with that. There is an element of fixed and...
- There are more pages in this discussion • 100 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add AIS (ASX) to my watchlist
(20min delay)
|
|||||
Last
25.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $241.8M |
Open | High | Low | Value | Volume |
25.0¢ | 26.0¢ | 25.0¢ | $497.1K | 1.961M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 497951 | 25.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
25.5¢ | 45000 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
16 | 497951 | 0.250 |
8 | 138448 | 0.245 |
17 | 501190 | 0.240 |
6 | 358605 | 0.235 |
12 | 506646 | 0.230 |
Price($) | Vol. | No. |
---|---|---|
0.255 | 45000 | 2 |
0.260 | 262918 | 9 |
0.265 | 118843 | 5 |
0.270 | 685343 | 7 |
0.275 | 463600 | 5 |
Last trade - 16.10pm 10/06/2024 (20 minute delay) ? |
|
|||||
Last
25.0¢ |
  |
Change
0.000 ( 1.96 %) |
|||
Open | High | Low | Volume | ||
25.3¢ | 26.0¢ | 25.0¢ | 1346215 | ||
Last updated 15.55pm 10/06/2024 ? |
Featured News
AIS (ASX) Chart |