88E 33.3% 0.4¢ 88 energy limited

flow testing

  1. 1,464 Posts.
    lightbulb Created with Sketch. 302
    looks like after monday the flow testing will take 10 to 14 days to complete so we will still have some very good trading days left along with hopefully some very juicy announcements. Project Icewine – Icewine#2 Production Testing
    Site works have commenced to clear snow and ice from the Franklin Bluffs gravel pad to enable
    access to the Icewine#2 wellhead. Pressure gauges will then be retrieved from downhole and data
    anaylsed to determine if any reservoir degradation is observed, which may require remedial action
    such as reperforation of the target intervals. Concurrently, test equipment including separators, tanks
    and nitrogen lift units will be mobilized to site ahead of the scheduled commencement of flow testing
    on the 11th June 2018.
    The flow testing program has been designed to utilize nitrogen lift to assist the removal of up to an
    additional 4,000 barrels of fluid from the HRZ reservoir. It is anticipated that this will enable the
    hydrocarbons in the reservoir to flow naturally to surface at a representative rate. Based on modelling
    of the reservoir pressure and fracture conductivity, this is estimated to take 10-14 days. The well will
    then continue to be flowed back to ascertain drawdown pressure and decline rate.
 
watchlist Created with Sketch. Add 88E (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.001(33.3%)
Mkt cap ! $115.5M
Open High Low Value Volume
0.4¢ 0.4¢ 0.3¢ $85.34K 21.97M

Buyers (Bids)

No. Vol. Price($)
540 670161300 0.3¢
 

Sellers (Offers)

Price($) Vol. No.
0.4¢ 347726457 89
View Market Depth
Last trade - 16.10pm 03/05/2024 (20 minute delay) ?
Last
0.4¢
  Change
0.001 ( 0.00 %)
Open High Low Volume
0.3¢ 0.4¢ 0.3¢ 29274106
Last updated 15.59pm 03/05/2024 ?
88E (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.