Update on Skols house build: The teak flooring on level 5 has been successfully layed, and I could shave in its reflection. Top notch job.
BBQ was great. NZ waiu steaks done perfectly over coals , a selection of cold seafoods and some ice cold Skol beers flown in from a friend of Skol doing a back trip on his Airbus. Skol hired a few buses and made sure the workers got home safely.
Gotta run, 6 am start on site tommorow. The Italian tiles hopefully arriving for the second level bathrooms .