From Zoombee on a US forum ... Figures not confirmed .. It looks as though we are progressing...
SSN kicks off next North Dakota project
Rainbow field has 8 Bakken and 6 Three Fork wells (23% WI)
Gladys 1-20H is the first up with Continental as operator, well is spud and rig being mobilized
Stockyard Creek field status
• Billabong waiting FRAC
• Bootleg 4 waiting FRAC
• Bootleg 5 waiting FRAC
• Matilda Bay 1 FRAC complete work over coil tubing
• Matilda Bay 2 shut-in while adjacent field FRAC’s a pad
• Bootleg 7 drilling vertical portion with Frontier 24 rig
• Bootleg 6 waiting vertical when Frontier 24 rig skids off BL 7
• Sail and Anchor has 48,462 BO
• Blackdog has 85,250 BO
• Tooheys has 54,088 BO
• Coopers has 41,397 BO
• Matilda Bay 2 has 14,784 BO
• Matilda Bay 1 has 1,010 BO work over
• Harstad 1-15H has 113,579 BO 86,319 MCF
• LEONARD 1-23H has 120,617 BO 135,432 MCF
• GENE 1-22H has 169,475 BO 201,646 MCF
• RODNEY 1-14H has 130,974 BO 182,844 MCF
• GARY 1-24H has 172,504 BO 273,010 MCF
• EARL 1-13H has 215,149 BO 306,514 MCF
• EVERETT 1-15H has 118,345 BO 154,922 MCF Less
ends