Reflecting on the Q3 Report that could come out today or probably tomorrow, and regarding the Milling & Flotation Equipment, "Sailing is scheduled for mid October". Could we see some photos of the equipment being loaded onto the ship? I'm perplexed as to what we do with the equipment once it lands in Brazil but hopefully the Q3 may have an explanation.
It would not be unreasonable to expect the Q3 Report to give us an update on how the engineering design is progressing.
Last report was Basic Design 60% and Detailed Engineering 20%.