LYC 3.88% $6.43 lynas rare earths limited

After welding the five segments of the furnace, a very...

  1. 262 Posts.
    lightbulb Created with Sketch. 12
    After welding the five segments of the furnace, a very time-consuming work begins. This is the lining of the entire pipe with refractory material. This work will take months, as well as sufficient time for the setting and hardening time of the mortar and the slow commissioning of the entire system.
 
watchlist Created with Sketch. Add LYC (ASX) to my watchlist
(20min delay)
Last
$6.43
Change
0.240(3.88%)
Mkt cap ! $6.010B
Open High Low Value Volume
$6.23 $6.45 $6.20 $20.00M 3.143M

Buyers (Bids)

No. Vol. Price($)
1 500 $6.40
 

Sellers (Offers)

Price($) Vol. No.
$6.44 5126 2
View Market Depth
Last trade - 16.10pm 29/04/2024 (20 minute delay) ?
Last
$6.41
  Change
0.240 ( 3.23 %)
Open High Low Volume
$6.23 $6.45 $6.19 855490
Last updated 15.59pm 29/04/2024 ?
LYC (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.