Morning trading February 3, page-6

  1. 2,748 Posts.
    NAE
    LIN -- At 29 January 2023, 40 holes for 6,456 metres of RC and 4 holes for 926 metres of core drilling has been completed of 12,500 metre Phase 1 drill program. The Phase 1 drill program is designed to provide data for resource evaluation and mine planning • Phase 2 drill program consisting of 2x 1,000 metre hole to immediately following completion of Phase 1 drill program. The Phase 2 drill program is designed to test the depth continuity of the carbonatite between 300 metres and 800 metres below the hill top • Steady stream of assays anticipated throughout February and March 2023
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.