I get your drift. I think both are correct but that the 800,000 tonne plant is the first bottleneck.
So allowing 10% downtime, at current grades 18,000 tonnes a possibility. Better grades more tonnes, more down time less tonnes etc.
- Forums
- ASX - By Stock
- AVB
- New analyst report up
New analyst report up, page-22
- There are more pages in this discussion • 58 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)