"The large reactors are not easily turned on or off, so are unsuited as peakers."
What rot. Weather is roughly predictable days in advance as are peaks.
The paradox with renewables is that, even if they are still cheap when all sneaky subsidies (cost of disposal, cost of transmission etc et al) they require something to provide base load power as we know (some of us know). But if the cost of this more reliable power is spread over just a few hours it is artificially made to look more costly.
- Forums
- ASX - By Stock
- Nuclear Power Related Media Thread
"The large reactors are not easily turned on or off, so are...
-
- There are more pages in this discussion • 78 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SLX (ASX) to my watchlist
(20min delay)
|
|||||
Last
$5.82 |
Change
0.390(7.18%) |
Mkt cap ! $1.378B |
Open | High | Low | Value | Volume |
$5.49 | $5.90 | $5.49 | $7.460M | 1.297M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 380 | $5.80 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$5.83 | 22627 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 380 | 5.800 |
1 | 1733 | 5.770 |
1 | 3552 | 5.730 |
1 | 3552 | 5.710 |
1 | 1754 | 5.700 |
Price($) | Vol. | No. |
---|---|---|
5.830 | 22627 | 3 |
5.850 | 4322 | 2 |
5.870 | 3552 | 1 |
5.880 | 4100 | 1 |
5.890 | 3799 | 2 |
Last trade - 16.10pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
$5.80 |
  |
Change
0.390 ( 7.31 %) |
|||
Open | High | Low | Volume | ||
$5.59 | $5.90 | $5.53 | 147581 | ||
Last updated 15.59pm 03/05/2024 ? |
Featured News
SLX (ASX) Chart |