Its HOLTEC and they want the site to use it for planning their...

  1. 9,470 Posts.
    lightbulb Created with Sketch. 39
    Its HOLTEC and they want the site to use it for planning their smr. After reading about Holtec I give this 12 months before it falls over.

    www.indeed.com /q-palisades-nuclear-l-saint-joseph,-mi-jobs.html

    Top 31 Palisades Nuclear Jobs in Saint Joseph, MI (Hiring Now)

    4-5 minutes

    Nuclear Control Operator (NCO)

    Holtec Decommissioning International (HDI) is currently seeking a Nuclear Control Operator (NCO) to join the Palisades Nuclear Plant team in Covert, MI.

    We are proud of our reputation for professional and technical excellence, and we recognize that the key to upholding that reputation resides in the excellence of our employees. We are looking for talent who brings value to the organization and contributes to advancing our business and reputation.

    Palisades Nuclear Power Plant may soon become the first nuclear power plant in the United States to restart after previously entering the early stages of decommissioning. By joining our team, you will be part of a unique and historic undertaking for the industry and the nation!


    # Renovating existing construction is totally fraught with cost overruns. Turning an existing npp being decommissioning back into a protype of their smr is wayout there. But I can see that the US can afford this trial. They have many npps in this situation.
    We have none in this situation.

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.