SAMSON OIL & GAS OPERATIONAL ADVISORY
Denver 1700 hours October 7th
, 2013, Perth 0700 hours October 8th
, 2013
NORTH STOCKYARD PROJECT, WILLIAMS COUNTY, NORTH DAKOTA
Tooheys 2-15-14HBK well (SSN WI 27.7%)
Following the cementing of the 7 inch casing string, the lateral portion of the Tooheys 2-15-14HBK
well was drilled to a depth of 18,435 feet. The lateral drilled thus far was maintained wholly within
the target zone in the middle Bakken Formation. Currently the well is being prepared to run the
production liner.
Billabong 2-13-14HBK well (SSN WI 24.86%)
Key Energy Services Rig 370 has continued workover operations on the Billabong 2-13-14HBK
well. The rig has successfully removed several joints of the cemented drill pipe from the wellbore
and will continue to use the current method of a wash-over assembly to remove the remaining drill
pipe.
Sail and Anchor 1-13-14HBK well (SSN WI 25.03%)
The Sail and Anchor well came on production September 16th
following the initial post frac
flowback. To ensure the hydraulic fracture proppant pack remains in place as per the design, the
well was flowed choked back on a 24/64ths choke. Initial production averaged 637 bopd with
cumulative oil production to the end of September of 7,013 bbls (11 days of production).
- Forums
- ASX - By Stock
- SSN
- operational advisory
operational advisory
- There are more pages in this discussion • 13 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)