another good announcement from krz

  1. 115 Posts.
    Hi all
    Wonder what it takes to move this stock?
    oil is flowing freely money in the bank and more to come soon still s/price doesnt want to move north
    it wont be long now i reckon plenty of accumulation been taking place in the 007-008 cents range and nearly ready to move up a notch or 2
    my opinion only please do your own research

    Oseil Oilfield Production Update

    Document date: Mon 24 Feb 2003 Published: Mon 24 Feb 2003 15:24:43
    Document No: 135856 Document part: A
    Market Flag: Y
    Classification: Progress Report
    KALREZ ENERGY LIMITED 2003-02-24 ASX-SIGNAL-G

    HOMEX - Adelaide

    +++++++++++++++++++++++++
    Kalrez Energy Limited is a 2.5% shareholder in the Seram Joint
    Venture that operates the Oseil oilfield. The major shareholder, and
    Operator of the JV, is KUFPEC (Indonesia) Limited with 97.5%.

    Production from the Oseil oilfield commenced on December 30th 2002,
    with processing taking place through a Temporary Production System
    ("TPS") nominally rated to approximately 12,000 barrels per day
    throughput.

    The TPS facility is a temporary process facility to be utilized until
    the permanent facilities currently being installed are completed.
    Current expectations are that the permanent facilities will be
    available during April 2003.

    REPORTING PERIOD FROM MIDNIGHT TO MIDNIGHT
    16TH FEB 2003 23RD FEB 2003

    Oil produced for the period 80,055 barrels of oil

    Average daily production for the period 11,436 barrels of oil

    Cumulative oil produced from 31/12/2002 445,842 barrels of oil

    Oil sold during the period 241,299 barrels of oil
    (as reported in ASX Announcement 06/02/2003)

    Oil in stock 204,543 barrels of oil

    The above represent total production from the Oseil oilfield as
    reported by the Operator. Kalrez entitlement is 2.5% of this
    production after deducting operating costs and Indonesian government
    entitlements.

    COMMENTS

    All three wells Oseil #1, Oseil #2 and Oseil #4 on production.

    Steam heaters arrived on location 3rd Feb 2003 and remain operating
    under field trial control and performing effectively in the TPS
    process system to assist in combating foam induced process problems
    and to aid water separation (emulsion breakdown).

    Current operations are continuing production through the TPS system.

    G Mercorella
    CHAIRMAN

    For further information please contact:

    Mr Russell Brimage Mr Guisepe (Joe) Mercorella
    Jakarta Office Adelaide Office
    Ph: 0011 6221 769 6977 Ph: 08 8239 2666
    Fax: 0011 6221 769 7012 Fax: 08 8239 1744
    Email: [email protected] Mobile: 0403 680 570
    Email: [email protected]

    Mr Eddie Smith
    Ph: (08) 9362 9330
    Fax: (08) 9362 9331
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.