PLS 2.24% $4.10 pilbara minerals limited

The concrete will be dry shortly, and the pre-fabricated...

  1. 492 Posts.
    lightbulb Created with Sketch. 239
    The concrete will be dry shortly, and the pre-fabricated components of the plant will be dropped into place by all of those cranes onsite. Watch closely, commissioning will ramp up pretty quickly from that point
 
watchlist Created with Sketch. Add PLS (ASX) to my watchlist
(20min delay)
Last
$4.10
Change
0.090(2.24%)
Mkt cap ! $12.38B
Open High Low Value Volume
$4.02 $4.17 $4.00 $91.74M 22.42M

Buyers (Bids)

No. Vol. Price($)
1 12066 $4.10
 

Sellers (Offers)

Price($) Vol. No.
$4.11 223809 10
View Market Depth
Last trade - 16.10pm 17/05/2024 (20 minute delay) ?
Last
$4.10
  Change
0.090 ( 2.33 %)
Open High Low Volume
$4.02 $4.17 $4.01 6329493
Last updated 15.59pm 17/05/2024 ?
PLS (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.