    After reviewing the Q3, and seeing that engineering design is not complete and finance is still no further advanced from what we were told last time, I see little chance of construction starting before Christmas.
    Even AVB are now considering holidays and wet weather, (maybe they do read HC after all).
    Construction duration is 6 to 9 months.

    My prediction is commissioning Q4 2015 at best, most likely Q1 2016 based on what I have seen so far this year.

    The Ball Mill and Floatation Cells didn't sail?

    "Adjudicating" subcontractors? Perhaps that was meant to be requesting "Expressions of Interest"?
 