After reviewing the Q3, and seeing that engineering design is not complete and finance is still no further advanced from what we were told last time, I see little chance of construction starting before Christmas.
Even AVB are now considering holidays and wet weather, (maybe they do read HC after all).
Construction duration is 6 to 9 months.
My prediction is commissioning Q4 2015 at best, most likely Q1 2016 based on what I have seen so far this year.
The Ball Mill and Floatation Cells didn't sail?
"Adjudicating" subcontractors? Perhaps that was meant to be requesting "Expressions of Interest"?