The low temp of the geothermal brine, around 160C requires the use of a Rankine cycle process where the heat of the brine water is exchanged into a fluid such as isobutine (similar to a refrigerant gas) that has a lower boiling point than water and runs in a loop isolated from any brine through turbines and condenser. The temperature of the brine, now down to about 80C is conveyed to the DLE plant, then reinjected back down to the aquifer. Scaling in the brine water lines is still an issue that requires periodical maintenance.
They are listed on ASX and the Bourse in Frankfurt
- Forums
- ASX - By Stock
- VUL
- Questions on Vulcan from a beginner
Questions on Vulcan from a beginner, page-4
- There are more pages in this discussion • 35 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add VUL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$4.94 |
Change
0.110(2.28%) |
Mkt cap ! $916.4M |
Open | High | Low | Value | Volume |
$4.86 | $4.97 | $4.86 | $718.9K | 146.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 4102 | $4.92 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$4.94 | 758 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 3424 | 4.920 |
6 | 6291 | 4.910 |
6 | 4566 | 4.900 |
6 | 11617 | 4.890 |
5 | 12827 | 4.880 |
Price($) | Vol. | No. |
---|---|---|
4.940 | 7424 | 3 |
4.950 | 6686 | 7 |
4.960 | 16058 | 7 |
4.970 | 33426 | 8 |
4.980 | 5769 | 3 |
Last trade - 11.48am 13/06/2024 (20 minute delay) ? |
|
|||||
Last
$4.95 |
  |
Change
0.110 ( 2.46 %) |
|||
Open | High | Low | Volume | ||
$4.87 | $4.97 | $4.86 | 9555 | ||
Last updated 12.02pm 13/06/2024 ? |
Featured News
VUL (ASX) Chart |
The Watchlist
RCE
RECCE PHARMACEUTICALS LTD
James Graham, CEO
James Graham
CEO
SPONSORED BY The Market Online