Whats left Cool energy I guess
GPC will submit a development plan for the Galoc Field to the Philippines Department of Energy before the end of the year. Production is scheduled to begin early 2007. The initial phase of development of two wells is expected to recover approximately 6 million barrels of oil in about 18 months, but further upside potential exists in the field that could increase reserves.
First oil from Galoc is anticipated in early 2007 with an initial production rate from the field of around 15,000 barrels of oil per day. The first phase of the development plan will aim to recover around 7 million barrels, although further detailed geoscience and reservoir engineering studies are underway at present which may result in a revision of the geological and reservoir simulation models for the field.
The Philippine fiscal regime is a production sharing system and is generally regarded as one of the most attractive by international standards.
http://www.granbyenterprises.com/ops-phili.asp
- Forums
- ASX - By Stock
- NDO
- galoc prod early 2007 so that wont be new ann:
galoc prod early 2007 so that wont be new ann:
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add NDO (ASX) to my watchlist
(20min delay)
|
|||||
Last
92.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $210.9M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 11538 | 90.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
92.5¢ | 14594 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 11538 | 0.905 |
2 | 26350 | 0.900 |
1 | 10000 | 0.890 |
1 | 25000 | 0.880 |
1 | 28571 | 0.875 |
Price($) | Vol. | No. |
---|---|---|
0.925 | 14594 | 2 |
0.930 | 50000 | 1 |
0.970 | 19999 | 2 |
0.995 | 10000 | 1 |
1.010 | 989 | 1 |
Last trade - 11.31am 27/05/2024 (20 minute delay) ? |
Featured News
NDO (ASX) Chart |
Day chart unavailable