Short Term Trading Week Starting: 08 Apr, page-12

  1. 6,059 Posts.
    lightbulb Created with Sketch. 291
    GCX Closed 52 week high 6.5 cents. update announcement today.
    Hint Based on visuals we think we will drill more holes.


    Highlights:
    • 17 drillholes have been completed at the Dante copper, gold and platinum group element (“PGE”) project
    for a total of approximately 3,600 metres as part of the maiden reverse circulation (“RC”) drill program.
    • All 17 completed holes have been despatched to the laboratory for assay. Approximately 30 more RC
    drillholes are planned across the 4 priority prospects.
    • Based on initial visual observations, the drill program has now been expanded from a planned 30 drillholes
    to approximately 47 drillholes.
    • Drilling commenced at the Cronus magmatic copper-gold sulphide target before moving to the Crius copper,
    gold, PGE reef.
    • Next, the drill rig will move to the Hyperion copper, gold, PGE reef, where the field team have identified a new
    gossan near planned drilling. This will be followed by the Oceanus copper, gold, PGE reef.
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.